New Construction in Las Vegas Valley

Just Got the Keys to a New Vegas Home? Here's the Plan for That Dirt Lot

Most new builds here come with a bare dirt backyard. Here's the order to build it in and the HOA deadline to watch, in a two minute read.

You closed, walked out back, and found a fenced rectangle of dirt. That's actually the good version. There's nothing to tear out, so you get to set the grade, the drainage, and the surfaces right the first time.

A bare Las Vegas backyard taken from dirt lot to a finished paver and turf yard

The Two Clocks

Travertine steps down to the patio, a Unique Pavers job in the Las Vegas valley

The HOA Clock

Your Landscape Deadline

Most new build communities give you 6 to 12 months from close to finish landscaping and get it approved. Miss it and the fines can repeat every month. We handle the submittal, so that clock stops being your problem.

The Calendar Clock

Booking the Crew

Summer is our busiest season and the calendar fills early. Design while you're in escrow and book at closing, and you'll break ground on your schedule instead of waiting for a slot.

Questions about your lot? Call or text (702) 628-0009

How Much Does a New Build Backyard Cost in Las Vegas?

It depends on the lot. Square footage comes first, then base depth, any grade problem the builder left, whether a machine fits through the gate, and the pavers and drainage the design calls for. Here's how most new owners build, from the smallest step to the whole yard.

New Build Backyard Tiers
Tier Best for What it covers
Starter Buying time Grade, drainage, and a clean gravel or decomposed granite yard. No dust and no HOA letter.
Core First real yard A paver patio off the back door on a proper base, a turf zone, and your first shade.
Full Finishing it out A bigger paver living area, turf, a shade structure, desert planting, and lighting, fence to fence.
Premium All of it, once Wide patio, covered shade, turf, fire pit, full planting, and a scaled plan sheet you approve before we dig.

Build It in This Order

Cobble paver patio, a Unique Pavers job in the Las Vegas valley
  1. Drainage and grade. Water has to run away from the house and the neighbor's wall. You'll never see this step, and it matters most.
  2. Shade. The shaded zone is the zone you'll use, so it drives the layout.
  3. Pavers and base. Patio, walkways, and pool surround, on a compacted base that stays flat.
  4. Planting last. Plants go in healthy and nothing gets trampled by the crew.

Why the Order Matters

Plant first and regrade later, and you'll pull out plants you just paid for. Pour a patio before the grade is set, and water pools at the back door.

What About the Water Rebate?

Do This First

The SNWA rebate pays to replace live grass, so a bare dirt backyard doesn't qualify. If your builder put in a front lawn, that grass might, as long as nobody touches it before SNWA's pre inspection.

When it qualifies, here's what the program pays for grass you convert to living, drought tolerant landscaping. The details are on our rebate page.

Paver grid in turf at golden hour, a Unique Pavers job in the Las Vegas valley

Rates Confirmed June 2026

  • SNWA: $5 per square foot on the first 10,000 square feet, then $2.50.
  • LVVWD bonus: $2 more per square foot for Las Vegas Valley Water District customers.
  • City of Henderson: a flat $575 on top, minimum 400 square feet.
  • Trees: $100 per qualifying living tree.

Building in Cadence Summerlin or Skye Canyon?

Cadence

East Henderson, and one of the busiest master plans in the valley, with a lot of blank yards waiting on a first build.

Summerlin & Summerlin West

Premium builds and picky design guidelines. We put HOA submittals together out there every week.

Skye Canyon

Up in the northwest, with newer streets and plenty of dirt lots waiting on a first real backyard.

Geometric paver and turf backyard built on a new-construction Las Vegas lot
Paver and turf layout · the hybrid yard we build most on new lots
Two-tone paver driveway and entry on a newly built Las Vegas home
Paver patio & surfaces · Henderson
Fire pit and seating area built into a finished desert backyard at sunset
Shade & fire feature · the zone you use

One Package Dirt Lot to Finished

Travertine patio and fire pit, a Unique Pavers job in the Las Vegas valley

New Move in Design + HOA Submittal

From dirt lot to a backyard you use

One flat rate package, built for people who just got their keys.

  • Full HOA submittal package, drawings and material list included.
  • A free plan sheet drawn to scale before you commit.
  • Drainage, pavers, shade, turf, and plant zones planned as one design.
  • If your builder's grass qualifies for the rebate, we file it and book the pre inspection.
  • Financing through HFS with a soft credit pull, handy when closing just drained your savings.

Bare lot in Cadence, Summerlin, or Skye Canyon? Let's plan it before the HOA clock runs out.

Quick Answers for New Owners

Design while you're in escrow and build right after closing. The HOA deadline and our summer calendar both start running on day one.

Most Las Vegas HOAs give 6 to 12 months from close, and after that the fines can repeat monthly. We prepare the submittal and walk it through approval for you.